316
In the area of the Protected Landscape “Bijambare”, the road from the parking lot to the info point was repaired. The works included the removal of the existing layer of asphalt, planning and compaction of the subsoil, spreading, rolling and making the lower bearing layer of crushed limestone material and making the upper bit layers of asphalt. The total section that is paved is 490 meters.